BUB PROGRAMS AND PROJECTS

Refine by

DEFINITION OF TERMS

  • PROPOSED - The project has been proposed under the program but still has to undergo validation by the implementing agency.
  • PIPELINED - The agency has validated the proposed project and preparatory activities are being undertaken, such as preparation of Work and Financial Plans, preparation of documents to be submitted by LGUs and procurements activities (bidding and awarding of project).
  • ONGOING - The implementation of the project has started and there is already a visually verifiable physical accomplishment.
  • COMPLETED - The project has been physically completed.
  • DROPPED - Upon validation by the agency, it has been determined that the project will not be implemented.
  • NO DATA - No report received from the concerned implementing agency.
  • FIND BUB PROJECTS AND PROGRAMS

    Use OpenBUB.gov.ph to explore projects and programs implemented by LGUs across the Philippines.
    Disclaimer: All projects have been categorized in accordance with the 2013 Philippine Standard Geographic Code (PSGC).

    Display:
    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6620
    DILG
    DRM
    ₱6,380,000
    completed

    CONCRETING AND RIPRAPPING OF RIVERBANKS
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱6,380,000

    Location: SOFRONIO ESPAÑOLA, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱5,104,000
    2016 Q2                    ₱5,104,000
    2016 Q3                    ₱5,104,000
    2016 Q4                    ₱5,104,000
    2017 Q1                    ₱6,380,000
    2017 Q2                    ₱6,380,000
    2017 Q3                    ₱6,380,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    6621
    DSWD
    COMMUNITY DEVELOPMENT
    ₱1,120,000
    pipelined

    CONSTRUCTION OF DAY CARE CENTER
    Date Updated Jul 02, 2017

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,120,000

    Location: SOFRONIO ESPAÑOLA, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2016 Q4                    ₱896,000
    2017 Q1                    ₱896,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Health Facilities Enhancement Program
    6622
    DoH
    HEALTH
    ₱1,000,000
    pipelined

    PROVISION OF MEDICAL EQUIPMENTS
    Date Updated Aug 09, 2016

    • Implementation by: NGA
    • Final Project Amount: ₱1,000,000

    Location: SOFRONIO ESPAÑOLA, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q2                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Health Facilities Enhancement Program
    6623
    DoH
    HEALTH
    ₱1,000,000
    pipelined

    RENOVATION OF 2 UNIT BARANGAY HEALTH STATIONS
    Date Updated Aug 09, 2016

    • Implementation by: NGA
    • Final Project Amount: ₱1,000,000

    Location: SOFRONIO ESPAÑOLA, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q2                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6624
    DA
    AGRICULTURE & FISHERIES
    ₱1,900,000
    ongoing

    POBLACION BOAT LANDING
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,900,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱1,900,000
    2017 Q3                    ₱1,900,000
    2017 Q4                    ₱1,900,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6625
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    completed

    FOOD PROCESSING CENTER
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6626
    DA
    AGRICULTURE & FISHERIES
    ₱2,000,000
    ongoing

    BAGSAKAN CENTER
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱2,000,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱1,000,000
    2016 Q3                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000
    2017 Q4                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6627
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    completed

    ORGANIC VEGETABLE PRODUCTION
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱500,000
    2016 Q3                    ₱500,000
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6628
    DA
    AGRICULTURE & FISHERIES
    ₱800,000
    completed

    RICE PRODUCTION
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱800,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱550,000
    2016 Q3                    ₱550,000
    2017 Q2                    ₱550,000
    2017 Q3                    ₱550,000
    2017 Q4                    ₱550,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6629
    DA
    AGRICULTURE & FISHERIES
    ₱1,800,000
    ongoing

    SEAWEEDS FARMING
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,800,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱1,800,000
    2017 Q3                    ₱1,800,000
    2017 Q4                    ₱1,800,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6630
    DA
    AGRICULTURE & FISHERIES
    ₱1,200,000
    completed

    MUSSELS AND SEA CUCUMBER CULTURE
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,200,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱1,200,000
    2017 Q3                    ₱1,200,000
    2017 Q4                    ₱1,200,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    National Greening Program
    6631
    DENR
    ENVIRONMENT
    ₱1,000,000
    dropped

    RUBBER TREE SEEDLINGS DISTRIBUTION
    Date Updated Feb 08, 2018

    • Implementation by: No data available
    • Final Project Amount: ₱1,000,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2016 Q4                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    National Greening Program
    6632
    DENR
    ENVIRONMENT
    ₱500,000
    dropped

    IPIL-IPIL PLANTATION
    Date Updated Feb 08, 2018

    • Implementation by: No data available
    • Final Project Amount: ₱500,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2016 Q4                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Product Development
    6633
    DOT
    TOURISM
    ₱1,000,000
    ongoing

    TOURISM DEVELOPMENT PROJECT (VIEWDECK AND SOUVENIR SHOP)
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q2                    ₱0
    2017 Q2                    ₱700,000
    2017 Q3                    ₱700,000
    2017 Q4                    ₱700,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    6634
    DSWD
    COMMUNITY DEVELOPMENT
    ₱800,000
    ongoing

    RAINWATER COLECTOR
    Date Updated Jul 02, 2017

    • Implementation by: NGA
    • Final Project Amount: ₱800,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2016 Q4                    ₱640,000
    2017 Q1                    ₱640,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    6635
    DSWD
    COMMUNITY DEVELOPMENT
    ₱3,000,000
    ongoing

    BAHAY PAG-ASA
    Date Updated Jul 02, 2017

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱3,000,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2016 Q4                    ₱2,400,000
    2017 Q1                    ₱2,400,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Sustainable Livelihood Program
    6636
    DSWD
    SOCIAL WELFARE
    ₱500,000
    completed

    KISLAP SEAWEEDS TRADING
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: TAYTAY, PALAWAN, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    6637
    DILG
    WATER & SANITATION
    ₱12,500,000
    completed

    IMPROVEMENT/EXPANSION OF LEVEL III WATER SYSTEM
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱12,500,000

    Location: ALCANTARA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱10,000,000
    2015 Q4                    ₱10,000,000
    2016 Q2                    ₱10,000,000
    2016 Q4                    ₱12,500,000
    2017 Q1                    ₱12,500,000
    2017 Q2                    ₱12,500,000
    2017 Q3                    ₱12,500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6638
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    ongoing

    ESTABLISHMENT OF GOAT MULTIPLIER FARM
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: BANTON, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱500,000
    2017 Q3                    ₱500,000
    2017 Q4                    ₱500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6639
    DA
    AGRICULTURE & FISHERIES
    ₱3,000,000
    completed

    DRIFT GILL/RING NET FISHING GEAR
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱3,000,000

    Location: BANTON, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱3,000,000
    2017 Q3                    ₱3,000,000
    2017 Q4                    ₱3,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    6640
    DILG
    WATER & SANITATION
    ₱4,000,000
    completed

    SAGANA AT LIGTAS NA TUBIG (SALINTUBIG) - PROVISION OF POTABLE WATER SUPPLY (SPRING DEVELOPMENT, LEVEL I)
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱4,000,000

    Location: BANTON, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱3,200,000
    2016 Q2                    ₱4,000,000
    2016 Q3                    ₱4,000,000
    2016 Q4                    ₱4,000,000
    2017 Q1                    ₱4,000,000
    2017 Q2                    ₱4,000,000
    2017 Q3                    ₱4,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6641
    DILG
    DRM
    ₱1,000,000
    completed

    FLOOD CONTROL: RIPRAPING OF ARGAO CREEK IN BRGYS. SIBAY AND LIBTONG
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: BANTON, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱1,000,000
    2016 Q2                    ₱1,000,000
    2016 Q3                    ₱1,000,000
    2016 Q4                    ₱1,000,000
    2017 Q1                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Industry Clustering
    6642
    DTI
    ECONOMIC DEVELOPMENT
    ₱2,000,000
    completed

    ARROW ROOT/CASSAVA PROCESSING
    Date Updated Feb 08, 2018

    • Implementation by: NGA
    • Final Project Amount: ₱2,000,000

    Location: BANTON, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱43,000
    2015 Q4                    ₱43,000
    2016 Q1                    ₱43,000
    2016 Q2                    ₱43,000
    2016 Q4                    ₱2,000,000
    2017 Q1                    ₱2,000,000
    2017 Q2                    ₱2,000,000
    2017 Q3                    ₱2,000,000
    2017 Q4                    ₱2,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6644
    DA
    AGRICULTURE & FISHERIES
    ₱1,200,000
    pipelined

    PROVISION OF HANDTRACTORS, THRESSERS WITH TRAILERS
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,200,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6645
    DA
    AGRICULTURE & FISHERIES
    ₱600,000
    completed

    SUSTAINABLE AGRI-FISHERY BASED AND SANCTUARY AND MARINE PROTECTED AREA
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱600,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱600,000
    2017 Q3                    ₱600,000
    2017 Q4                    ₱600,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6646
    DA
    AGRICULTURE & FISHERIES
    ₱1,000,000
    completed

    PROVISION OF MOTORIZED FISHING BOATS/ MARINE ENGINE /FAD AND FISH NETS
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000
    2017 Q4                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6647
    DA
    AGRICULTURE & FISHERIES
    ₱750,000
    pipelined

    SHALLOW TUBE WELLS/SWIP
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱750,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6648
    DA
    AGRICULTURE & FISHERIES
    ₱700,000
    pipelined

    LIVESTOCK MULTIPLIER FARM
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱700,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6649
    DA
    AGRICULTURE & FISHERIES
    ₱780,000
    pipelined

    FRESHWATER CULTURE-TILAPIA AND FRESH WATER PRAWN (ULANG)
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱780,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6650
    DA
    AGRICULTURE & FISHERIES
    ₱506,000
    pipelined

    COFFEE, CACAO AND OTHER FRUIT TREES PLANTATION
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱506,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6651
    DA
    AGRICULTURE & FISHERIES
    ₱510,000
    pipelined

    RUBBER TREE PLANTATION
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱510,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    6652
    DILG
    WATER & SANITATION
    ₱1,500,000
    completed

    WATER SYSTEM REHABILITATION-SAGANA AT LIGTAS NA TUBIG SA LAHAT
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,500,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱1,200,000
    2015 Q4                    ₱1,200,000
    2016 Q2                    ₱1,200,000
    2016 Q3                    ₱1,500,000
    2016 Q4                    ₱1,500,000
    2017 Q1                    ₱1,500,000
    2017 Q2                    ₱1,500,000
    2017 Q3                    ₱1,500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6653
    DILG
    DRM
    ₱2,000,000
    completed

    REHABILITATION AND CONSTRUCTION OF DRAINAGE AND CANALS
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱2,000,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱1,600,000
    2015 Q4                    ₱1,600,000
    2016 Q2                    ₱1,600,000
    2016 Q3                    ₱2,000,000
    2016 Q4                    ₱2,000,000
    2017 Q1                    ₱2,000,000
    2017 Q2                    ₱2,000,000
    2017 Q3                    ₱2,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6654
    DILG
    DRM
    ₱1,000,000
    completed

    PROCUREMENT OF RESCUE EQUIPMENTS
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱900,000
    2015 Q4                    ₱900,000
    2016 Q2                    ₱900,000
    2016 Q3                    ₱900,000
    2016 Q4                    ₱900,000
    2017 Q1                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    6655
    DSWD
    COMMUNITY DEVELOPMENT
    ₱1,500,000
    pipelined

    BAHAY PAG-ASA FOR CICL
    Date Updated Jul 02, 2017

    • Implementation by: No data available
    • Final Project Amount: ₱1,500,000

    Location: CAJIDIOCAN, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2016 Q4                    ₱0
    2017 Q1                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6657
    DA
    AGRICULTURE & FISHERIES
    ₱600,000
    completed

    INFRASTRUCTURE SUPPORT TO AGRICULTURE AND FISHERY PRODUCTION AND DEVELOPMENT-PROVISION OF FISHNETS
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱600,000

    Location: CALATRAVA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2017 Q2                    ₱600,000
    2017 Q3                    ₱600,000
    2017 Q4                    ₱600,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6658
    DILG
    DRM
    ₱4,100,000
    completed

    CONSTRUCTION OF 10,601 L.M. GRAVITY FED POTABLE WATER SYSTEM LEVEL II
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱4,100,000

    Location: CALATRAVA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱3,280,000
    2016 Q2                    ₱3,280,000
    2016 Q3                    ₱3,280,000
    2016 Q4                    ₱3,280,000
    2017 Q1                    ₱3,280,000
    2017 Q2                    ₱3,280,000
    2017 Q3                    ₱3,280,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6659
    DILG
    DRM
    ₱3,500,000
    completed

    CONSTRUCTION/REHABILITATION OF CALATRAVA SEAWALL
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱3,500,000

    Location: CALATRAVA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱2,800,000
    2015 Q4                    ₱2,800,000
    2016 Q2                    ₱2,800,000
    2016 Q3                    ₱2,800,000
    2016 Q4                    ₱2,800,000
    2017 Q1                    ₱3,500,000
    2017 Q2                    ₱3,500,000
    2017 Q3                    ₱3,500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6660
    DILG
    DRM
    ₱645,000
    completed

    CONSTRUCTION OF CONCRETE BOX CULVERT WITH STEEL TRAILINGS AND CONCRETE APPROACH
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱645,000

    Location: CALATRAVA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱645,000
    2016 Q2                    ₱645,000
    2016 Q3                    ₱645,000
    2016 Q4                    ₱645,000
    2017 Q1                    ₱645,000
    2017 Q2                    ₱645,000
    2017 Q3                    ₱645,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    6661
    DSWD
    COMMUNITY DEVELOPMENT
    ₱1,560,000
    ongoing

    CONSTRUCTION OF 2 UNITS DAY CARE CENTERS
    Date Updated Jul 02, 2017

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,560,000

    Location: CALATRAVA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱1,248,000
    2016 Q4                    ₱1,248,000
    2017 Q1                    ₱1,248,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6663
    DA
    AGRICULTURE & FISHERIES
    ₱500,000
    pipelined

    CONSTRUCTION OF MULTI-PURPOSE BUILDING
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱500,000

    Location: CONCEPCION, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6664
    DA
    AGRICULTURE & FISHERIES
    ₱2,300,000
    pipelined

    CASSAVA AND ARROW ROOT PRODUCTION AND PROCESSIN G FACILITY
    Date Updated Feb 08, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱2,300,000

    Location: CONCEPCION, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱0
    2017 Q3                    ₱0
    2017 Q4                    ₱0

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    6665
    DILG
    WATER & SANITATION
    ₱1,000,000
    completed

    EXPANSION/IMPROVEMENT OF WATER SYSTEM
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱1,000,000

    Location: CONCEPCION, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱1,000,000
    2015 Q4                    ₱1,000,000
    2016 Q2                    ₱1,000,000
    2016 Q3                    ₱1,000,000
    2016 Q4                    ₱1,000,000
    2017 Q1                    ₱1,000,000
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6666
    DILG
    DRM
    ₱3,900,000
    ongoing

    FLOOD CONTROL: CONTRUCTION OF CANALS/DRAINAGE AND SEAWALLS
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱3,900,000

    Location: CONCEPCION, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱3,120,000
    2015 Q4                    ₱3,120,000
    2016 Q2                    ₱3,120,000
    2016 Q3                    ₱3,120,000
    2016 Q4                    ₱3,120,000
    2017 Q1                    ₱3,900,000
    2017 Q2                    ₱3,900,000
    2017 Q3                    ₱3,900,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Kalahi-CIDSS
    6667
    DSWD
    COMMUNITY DEVELOPMENT
    ₱1,500,000
    pipelined

    CONSTRUCTION OF DAY CARE CENTERS AND PROVISION OF NECESSARY LEARNING MATERIALS
    Date Updated Jul 02, 2017

    • Implementation by: NGA
    • Final Project Amount: ₱1,500,000

    Location: CONCEPCION, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2015 Q4                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱1,200,000
    2016 Q4                    ₱1,200,000
    2017 Q1                    ₱1,200,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Locally Funded Projects
    6669
    DA
    AGRICULTURE & FISHERIES
    ₱1,000,000
    completed

    INFRASTRUCTURE SUPPORT TO AGRICULTURE - PURCHASE OF TRACTORS AND THRESHERS
    Date Updated Feb 08, 2018

    • Implementation by: NGA
    • Final Project Amount: ₱1,000,000

    Location: CORCUERA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q3                    ₱0
    2016 Q1                    ₱0
    2016 Q2                    ₱0
    2016 Q3                    ₱0
    2017 Q2                    ₱1,000,000
    2017 Q3                    ₱1,000,000
    2017 Q4                    ₱1,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6670
    DILG
    DRM
    ₱2,500,000
    completed

    EVACUATION FACILITY - EVACUATION CENTER IN BRGY. MABINI,CORCUERA, ROMBLON
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱2,500,000

    Location: CORCUERA, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱2,000,000
    2015 Q3                    ₱2,000,000
    2015 Q4                    ₱2,000,000
    2016 Q2                    ₱2,500,000
    2016 Q3                    ₱2,500,000
    2016 Q4                    ₱2,500,000
    2017 Q1                    ₱2,500,000
    2017 Q2                    ₱2,500,000
    2017 Q3                    ₱2,500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    6672
    DILG
    WATER & SANITATION
    ₱12,500,000
    ongoing

    CONSTRUCTION AND REHABILITATION OF LEVEL II POTABLE WATER SYSTEM
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱12,500,000

    Location: FERROL, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱10,000,000
    2015 Q4                    ₱10,000,000
    2016 Q2                    ₱10,000,000
    2016 Q3                    ₱10,000,000
    2016 Q4                    ₱10,000,000
    2017 Q1                    ₱12,500,000
    2017 Q2                    ₱12,500,000
    2017 Q3                    ₱12,500,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    Portable Water Supply Projects
    6673
    DILG
    WATER & SANITATION
    ₱7,500,000
    ongoing

    CONSTRUCTION OF SAGANA AT LIGTAS NA TUBIG SA LAHAT (SALINTUBIG) LEVEL II
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱7,500,000

    Location: LOOC, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱6,000,000
    2015 Q4                    ₱6,000,000
    2016 Q2                    ₱6,000,000
    2016 Q3                    ₱6,000,000
    2016 Q4                    ₱6,000,000
    2017 Q1                    ₱6,000,000
    2017 Q2                    ₱6,000,000
    2017 Q3                    ₱6,000,000

    Physical Progress

    Project Year
    Program
    Project ID
    Implementing Agency
    Project Type
    Allocated Budget
    Project Status
    2015
    DILG-Other projects
    6674
    DILG
    DRM
    ₱3,000,000
    completed

    CORE LOCAL ROAD REHABILITATION: REHABILITATION OF ACCESS ROADS
    Date Updated Jan 02, 2018

    • Implementation by: LGU
    • LGU Counterpart Funding: ₱0
    • Final Project Amount: ₱3,000,000

    Location: LOOC, ROMBLON, IV-B

    Financial Disbursement
    2015 Q1                    ₱0
    2015 Q2                    ₱0
    2015 Q3                    ₱2,400,000
    2015 Q4                    ₱2,400,000
    2016 Q1                    ₱2,400,000
    2016 Q2                    ₱3,000,000
    2016 Q3                    ₱3,000,000
    2016 Q4                    ₱3,000,000
    2017 Q1                    ₱3,000,000
    2017 Q2                    ₱3,000,000
    2017 Q3                    ₱3,000,000

    Physical Progress